One charge: how long, and how much?

Pick the vehicle, choose which percentages to charge between, then enter the station's power and rate. The result updates instantly, and the link can be shared with your exact figures.

Choosing a vehicle fills in its battery capacity. You can still change the number.

By default it stops at 80% because that is where DC charging drops off sharply — the same reason factory claims almost always say “10–80%”.

Charging 60% of the battery means putting in 18 kWh, taking 23 min – 35 min, and costing Rp 46.361.

Charging time 23 min – 35 min a range, not a single figure
Cost per charge Rp 46.361 Rp 2.569 per kWh actually delivered
Into the battery 18 kWh billed 18,8 kWh
Equivalent range ± 180 km per manufacturer claim

Worked examples

Charging 20–80% at a 50 kW DC SPKLU at Rp2,466/kWh. The figures come from the same function as the calculator above — pick a vehicle to recalculate.

Vehicle Energy in Time Cost
BYD Atto 1 18 kWh 23 min – 35 min Rp 46.361
Jaecoo J5 EV 36,5 kWh 46 min – 1 hr 10 min Rp 93.862
BYD M6 33,2 kWh 42 min – 1 hr 4 min Rp 85.385

Charging FAQs

Why does charging stop at 80%?

Above 80%, DC charging tapers sharply — the last 20% can take as long as the previous 60%. Factory claims almost always read 10–80% for this reason.

Why do I pay for more than goes in?

Some energy becomes heat in the cable and battery. This calculator assumes 96% efficiency for DC and 88% for AC — both estimates, as catalogues never state the figure.

What is the difference between AC and DC charging?

AC (up to 22 kW) goes through the car's onboard charger: slow but steady — home sockets and wallboxes are AC. DC (above 22 kW) goes straight to the battery: fast but slows near full — fast SPKLU stations are DC.

Is a 150 kW station always faster than a 50 kW one?

Not necessarily — a car only accepts up to its own limit. If your car's limit is 50 kW, plugging into a 150 kW station still charges at 50 kW. Our catalogue does not record each vehicle's limit yet, so the maths assumes the full station power is absorbed.

What's not counted here

Continue